How to choose an ERP for manufacturing: what your factory actually needs

Choosing an ERP for a factory is a decision you live with for years. This guide sums up what we learned implementing ERPNext in powder coatings, food, furniture and electrical panel factories.

Signs your factory needs an ERP

  • Product cost is estimated in Excel, not calculated from actual consumption.
  • You find out a material is short when the line stops, not before.
  • You don't know the real loss in each work order.
  • System stock balances don't match the physical count.
  • Management waits for month-end to see profitability.

What a manufacturing ERP should cover

Bills of materials (BOM)

Components and quantities for each product, multi-level.

Work orders and job cards

Automatic material issue and tracking of every stage and workstation.

Production and material planning

Material needs from the sales plan, with purchase requests created automatically.

Actual cost

Cost of every work order compared with plan.

Quality and batches

Quality inspections, batch numbers and expiry dates.

Accounting and e-invoicing

Every production movement posts to accounts, and invoices go to the tax authority.

Details →

Questions to ask any ERP vendor before you sign

QuestionWhy it matters
Have you implemented it in a factory like ours?Same-industry experience saves weeks of trial and error.
How will our product cost be calculated?A generic answer is a sign they don't understand manufacturing.
Who will train the factory team?Storekeepers and line supervisors need different training from accountants.
What happens after go-live?Post go-live support decides whether the project succeeds.

From our work with clients

Creative Closets

Furniture — design & installation

Before

Each project was tracked across people and files, from first call to installation.

What we did

One pipeline per project inside the system: lead, site visit, manufacturing, installation, then after-sales.

Newmix

Electrostatic powder coatings manufacturer — since 2010

Before

Production was recorded without work orders, so actual material use and losses were hard to see.

What we did

Work orders that issue materials automatically, an allowed loss limit, and a plain-language user guide for the factory team.

SeaFood Factory

Food industry

What we did

Customisations that fit how the factory works, and controls that stop issuing stock that is not available.

Questions we hear a lot

What is the best ERP for factories in Egypt?

The best one covers BOMs, work orders, actual cost and quality, supports Egyptian e-invoicing, and is usable by your team. ERPNext does this without per-user licence fees.

How does the system calculate product cost?

From materials actually issued to the work order, labour and operations from job cards, and overheads using the allocation method you choose.

Does it track scrap and losses?

Yes. We set an allowed loss percentage per product, and each work order shows planned versus actual.

Does it support subcontracting?

Yes: sending materials to an external contractor, receiving finished goods and costing them.

How long does a factory ERP implementation take?

Usually 6 to 16 weeks depending on products and production lines, in phases starting with inventory and then manufacturing.

Have a question about your current system or a new project?

Tell us about your company in a short call, and we will tell you honestly whether we are the right fit.