How to choose an ERP for manufacturing: what your factory actually needs
Choosing an ERP for a factory is a decision you live with for years. This guide sums up what we learned implementing ERPNext in powder coatings, food, furniture and electrical panel factories.
Signs your factory needs an ERP
- Product cost is estimated in Excel, not calculated from actual consumption.
- You find out a material is short when the line stops, not before.
- You don't know the real loss in each work order.
- System stock balances don't match the physical count.
- Management waits for month-end to see profitability.
What a manufacturing ERP should cover
Bills of materials (BOM)
Components and quantities for each product, multi-level.
Work orders and job cards
Automatic material issue and tracking of every stage and workstation.
Production and material planning
Material needs from the sales plan, with purchase requests created automatically.
Actual cost
Cost of every work order compared with plan.
Quality and batches
Quality inspections, batch numbers and expiry dates.
Accounting and e-invoicing
Every production movement posts to accounts, and invoices go to the tax authority.
Details →Questions to ask any ERP vendor before you sign
| Question | Why it matters |
|---|---|
| Have you implemented it in a factory like ours? | Same-industry experience saves weeks of trial and error. |
| How will our product cost be calculated? | A generic answer is a sign they don't understand manufacturing. |
| Who will train the factory team? | Storekeepers and line supervisors need different training from accountants. |
| What happens after go-live? | Post go-live support decides whether the project succeeds. |
From our work with clients
Creative Closets
Furniture — design & installation
Before
Each project was tracked across people and files, from first call to installation.
What we did
One pipeline per project inside the system: lead, site visit, manufacturing, installation, then after-sales.
Newmix
Electrostatic powder coatings manufacturer — since 2010
Before
Production was recorded without work orders, so actual material use and losses were hard to see.
What we did
Work orders that issue materials automatically, an allowed loss limit, and a plain-language user guide for the factory team.
SeaFood Factory
Food industry
What we did
Customisations that fit how the factory works, and controls that stop issuing stock that is not available.
Questions we hear a lot
What is the best ERP for factories in Egypt?
The best one covers BOMs, work orders, actual cost and quality, supports Egyptian e-invoicing, and is usable by your team. ERPNext does this without per-user licence fees.
How does the system calculate product cost?
From materials actually issued to the work order, labour and operations from job cards, and overheads using the allocation method you choose.
Does it track scrap and losses?
Yes. We set an allowed loss percentage per product, and each work order shows planned versus actual.
Does it support subcontracting?
Yes: sending materials to an external contractor, receiving finished goods and costing them.
How long does a factory ERP implementation take?
Usually 6 to 16 weeks depending on products and production lines, in phases starting with inventory and then manufacturing.
Have a question about your current system or a new project?
Tell us about your company in a short call, and we will tell you honestly whether we are the right fit.